Weyermannshaus Open-Air Pool
The Weyermannshaus open-air pool in western Bern grew out of a medieval pond and has one of the largest swimming pools in Europe.

- Address
- Stöckackerstrasse 9, (11, 15) 3027 Bern
- Built
- 1957/58 (open-air pool), 1970/71 (indoor pool and ice rink); bathing place since 1908–1910
- Architect
- Hans Beyeler
- Today
- Municipal open-air pool with indoor pool and ice rink, renovated 2020–2022
About the building
In the west of the city, in the Untermatt district, a large, almost lake-like expanse of water lies between the Bremgarten forest to the north and the A12 motorway viaduct to the east. Locals affectionately call the pool „Weyerli“, little pond. Besides the open-air pool, the complex includes an indoor pool, an artificial ice rink and a restaurant. Outside the bathing season the grounds serve as a park.
The name recalls an old pond. In 1235 Henry of Hohenstaufen gave the Bernese mayor Peter von Bubenberg a pond outside the city as a fief, and in 1338 the city sold Hans von Bubenberg a piece of common land by the „wyer von Bubenberg“. The name of the estate probably derives from the house of the man who looked after the water. By the 16th century three connected fish ponds had developed, drained in turn. From 1620 they were drained for good and the land was farmed. Only part of the westernmost pond survived; a bathing place with natural banks was set up there in 1908–1910.
The site became a municipal open-air pool at the end of the 1950s. According to Wikipedia, the edge of the basin was concreted in 1957; the City of Bern gives 1958 as the year of construction. The buildings were designed by the architect Hans Beyeler, among them a main building, a restaurant and changing rooms. The southern changing building of 1958 is the last of three originally identical buildings and is a listed monument. The indoor pool and ice rink followed in 1970 according to Wikipedia, in 1971 according to the city's documents; at the same time the basin, which had been losing a lot of water into the ground, was sealed.
Since 1958 the basin has been filled with groundwater. Wikipedia gives its surface as 16,000 square metres, the city as just under 15,500; its volume is about 25,000 cubic metres. For a long time the hand-chlorinated water flowed untreated into the Wohlensee, and part of it kept seeping away. In September 2020 voters approved a credit of 48 million francs. After a year and a half of works the pool reopened on 14 May 2022, with a new basin surface, water treatment, a redesigned children's pool and a wide slide. The indoor pool and ice rink are to be replaced by a new building.
Researched and summarised by Bärn Kit. Sources: Stadt Bern: Vortrag des Gemeinderats an den Stadtrat, Sanierung Freibad Weyermannshaus · Nau.ch: Berner Weyerli erstrahlt in neuem Glanz (Mai 2022) · Wikipedia (de): Weyermannshaus · Wikidata: Q23021448
Buildings nearby
Stöckacker Primary School330 mSteigerhubel School Complex550 mSchwabgut School Complex690 mSchwabgut single-family housing estate790 mResidential towers in Schwabgut840 mBack and ForthArtwork · 100 mBathing in QuestionsArtwork · 100 mUntitledArtwork · 340 mClassification and address: Bauinventar © Amt für Kultur des Kantons Bern · Wikidata. Found a mistake? Write to hallo@uebrig.ch.